US dumping levy, slow local bidding to worsen domestic solar panel glut

Published

This article appears to be a duplicate or heavily summarized version of the article found on pages 4-5 of the PDF. The content discusses the same issues, including the 50% U.S. tariff on Indian solar panel exports, the potential for anti-dumping duties, and the domestic slowdown in project bidding, all contributing to an impending overcapacity problem. It also reiterates that Indian solar module factories are operating at only 25% of capacity.

Get in touch with us

Fill the following details and send your query to us and we will provide the support you need.

Support Center 24/7

+022 4322 4000 (25 lines) Time : 10 AM - 6 PM

Our Location

1st Floor, Old Oriental Building, 65 M.G. Road, Mumbai: 400023