India’s first dedicated green methanol bunkering facility at V.O. Chidambaranar Port in Thoothukudi is gearing up to commence commercial operations by the end of November. Funded under the National Green Hydrogen Mission with a financial allocation of ₹35.34 crore, the project positions the port as a major alternative marine-fuel destination on the east-west maritime corridor. The bunkering infrastructure features 1,500 cubic meters of storage capacity connected via a 2.8-kilometer stainless-steel pipeline to the jetty, utilizing high-capacity transfer pumps and automated safety controls. Port estimates indicate that nearly 80 percent of cargo vessels operating along the Rotterdam-Tuticorin-Singapore route pass within close proximity, offering significant competitive advantages. Meanwhile, Gujarat Pipavav Port has delayed the commissioning of its three-million-tonne liquid jetty by three to four months to March or April next year due to construction timeline adjustments.